Warp House construction

A Cape Cod Prefab Fans Out Toward the Forest in Three Tapering Branches

7 of 17

The Warp House was constructed in 14 months, with six months spent on the design. Of the remaining eight months of construction, approximately half that time was spent preparing the site and utilities.