The bathroom required major work early on in the project, including demolishing a brick chimney breast. "The entire bathroom had to be redone, and it was a slow burn ripping the existing bathroom out," says Nadine. "I wouldn’t say I’m fussy, but I’m not the type of person who volunteers for grubby jobs. I didn’t flinch at doing some of the disgusting jobs here, though, as it's our house."