Hilary and Michael’s firm, MOS, served as general contractor on the project, collaborating with engineering firm Silman to maximize construction speed and economy. They used only wood framing and a newly devised Douglas fir plywood ceiling wedge that provides lateral strength. The bar stools are from Vitra.