As Seattle's first LEED Platinum Modular Home, Lane Street was completed by Hybrid Architecture and Greenfab with a focus on energy reduction through a combination of eco-friendly exterior materials and energy-conscious heating and cooling equipment, including a hybrid heat-pump water heater and energy recovery ventilation. The 1,870-square-foot home consists of three bedrooms, and was completed for an all-in cost of $405,000 in 2010.