Project posted by Kevin Butler

The Taylor Coach House

Year
2023
Structure
House (Single Residence)
Style
Modern
Lane/North Elevation: Two Level (with basement) Coach House under construction.  Completion date spring 2023.
Lane/North Elevation: Two Level (with basement) Coach House under construction. Completion date spring 2023.
Once complete, the existing single family home will be demolished and a new modern 3000 SF home will be constructed on the south side of the 50' x 147' lot.
Once complete, the existing single family home will be demolished and a new modern 3000 SF home will be constructed on the south side of the 50' x 147' lot.

Credits

Posted by
Architect
Kd.B Design Studio Ltd.
Landscape Design
Kd.B Design Studio Ltd.
Builder
Taycondesign

From Kevin Butler

Modern 1000 SF Coach House, two level with basement in the City of North Vancouver. The Coach House is currently under construction and will be completed in the spring of 2023. Once complete, the existing single family home will be demolished and a new modern 3000 SF home will be constructed.